Alconbury Weston Bridge
Client: Cambridgeshire County Council. The objective of this project was to determine the usability and resulting load bearing strength when injecting the substrate material contained between the masonry structure and the road surface above. This was done by undertaking the injection of two separate areas, using two different materials. These works have allowed for not one but two possible results and corresponding costing.
All injection was undertaken below 4bar of pressure.